Connect with us

Crime & Safety

Oxfordshire boxer is England champion after 11-month injury

Published

on


Jimmy Joyce, of the Didcot Amateur Boxing Academy, has become the highest ranked boxer in his age group after beating a three times national champion from Islington.

He won the bout on March 22 and so will automatically be selected for England Boxing, representing them at the Four Nations Championship to be held in Motherwell between Thursday June 11 and Sunday, June 14.

READ MORE: Oxfordshire boxing coach targets Olympics after MAJOR award

In addition, the teenager, who lives in Oxford, will also compete at European level.

Mr Joyce’s achievement is made all the more remarkable by the fact he has only recently recovered from a severe injury.

Boxing coach and founder of the Didcot club Kieran Davis explained that when Mr Joyce was returning from a bout in Wigan last year he was involved in a car crash.

A scaffold lorry went into the back of his parent’s car while he was in the middle seat at the back.

“If he wasn’t at the middle of the back seat, who knows,” said Mr Davis.

Kieran Davis coaching at the Didcot boxing club (Image: Kieran Davis)

He added: “When the scaffold lorry went into the back of the car, it forced Jimmy forward but crushed his knee into the back seat, resulting in him breaking his knee.”

The lorry drove off afterwards, leaving him on the roadside waiting for medical attention.

He was transferred to hospital and subsequently spent 11 months recovering from the serious injury.

Mr Davis explained: “Potentially he might never have been able to box again.”

However, after almost a year on the side-lines, he returned to the gym.

“We got him back training”, his coach said, who added that they worked on building up his fitness including through lots of one-to-one sessions.

Just after Christmas he returned to the ring and since then has not looked back.

Mr Davis said: “Six fights later he has now been crowned number one again in England and selected to box for England at national level.”

READ MORE: UK retailer shuts Oxfordshire branch as administration continues

The coach – who was crowned 2025 Male Boxing Coach of the Year by England Boxing – said that he was in awe of the youngster’s hard work and discipline, which he kept even when he was in a wheelchair.

Mr Joyce ran 12 miles a week once recovered and Mr Davis called it an “absolutely remarkable story”.

He said: “This is Jimmy Joyce, a local lad from Oxford, who wears his heart on his sleeve, is one of the humblest kids, an absolute idol and a dream to work with.”





Source link

Continue Reading
Click to comment

Leave a Reply

Your email address will not be published. Required fields are marked *

Crime & Safety

Fire service statement after ‘black smoke’ seen over Oxford

Published

on


People in the city were left speculating after a huge plume of smoke was seen rising from the Cowley area in Oxford on Tuesday (March 7) from about 7pm.

The fire and rescue service confirmed that firefighters were called at about 6.45pm on Tuesday to an incident in Oxford Road, Garsington.

READ MORE: Man found dead after major police response at Culham Lock

The large black smoke cloud billows over the city.The large black smoke cloud billows over the city. (Image: Rod Hiles / X)

Black smoke was produced when two cars and a kerosene oil tank caught fire, also damaging the outside of a home on the road.

Firefighters deployed from fire stations in Slade, Woodstock and Kidlington battled the blaze for about three hours to bring it safely back under control.

A spokesperson for the fire service said: “Oxfordshire Fire and Rescue Service was called at 6.46pm yesterday evening, sending fire engines from Slade, Woodstock and Kidlington fire stations to Oxford Road, Garsington.

The large black smoke cloud billows over the city.The large black smoke cloud billows over the city. (Image: Chantelle Gunby / X)

“The incident involved two cars and a kerosene oil tank destroyed by fire, with the exterior of a domestic property also affected by the fire.

READ MORE: Petition calls for progress on Oxford to Cambridge trainline

“Crews wearing breathing apparatus used hosereels to deal with the fire.

“They departed initially at 9.48pm, however, as a precaution carried out a reinspection at midnight.”

Pictures shared of the smoke show it was visible from across city, with one resident in Iffley spotting the incident from their window, with emergency vehicle sirens heard in the distance.





Source link

Continue Reading

Crime & Safety

Major change to UK passport fees comes into effect today

Published

on



The government has announced an increase to passport fees, which comes into effect from today (April 8).

Here’s what we know about the price increase, including how much adult and child passports will cost.



Passport fees to increase for Brits from April

In its original announcement, the government said the new prices needed to be approved by Parliament as it released the proposed prices.

The government has since confirmed that prices will increase today.

Here are the new prices:

Standard online application:

  • For adults – £102 (up from £94.50)
  • For children – £66.50 (up from £61.50)

Standard postal application:

  • For adults – £115.50 (up from £107)
  • For children – £80 (up from £74)

A Premium Service (one day) application made from the UK will cost £239.50, up from £222.

A standard online application that’s applied for from overseas will cost £116.50 for adults (increased from £108) and £75.50 for children (up from £70).

If you apply from overseas for a new standard passport by post, you can expect the price to jump from £120.50 to £130 for adults and from £82.50 to £89 for children.

Why are passport fees going up?

The government said: “The new fees will help the Home Office to continue to move towards a system that meets its costs through those who use it, reducing reliance on funding from general taxation.

“The government does not make any profit from the cost of passport applications. 

“The fees contribute to the cost of processing passport applications, consular support overseas, including for lost or stolen passports, and the cost of processing British citizens at UK borders.”


Recommended reading:


How long does it take to get a new passport?

The government asks Brits to apply for a passport “in good time before travelling”.

It added: “In 2025, where no further information was required, 99.7% of standard applications from the UK were processed within three weeks.”

What do you think of the new passport fees? Let us know in the comments below.





Source link

Continue Reading

Crime & Safety

Petition calls for progress on Oxford to Cambridge trainline

Published

on


Calls for progress continue to be made by people who are frustrated by the delay to the line’s re-opening to passengers after nearly 60 years, despite construction being completed on the section from Oxford to Milton Keynes in December 2024.

Currently, only freight trains are running on the route which connects Oxford, Oxford Parkway and Bicester to Cambridge, via stations like Milton Keynes and Bedford.

READ MORE: Oxford Speedway clash cancelled amid ‘complex negotiations’

Among the issues which have delayed the official opening of the £7 billion new train line is an ongoing dispute between the Rail, Maritime and Transport (RMT) Union, which represents train guards and drivers, and East West Rail line operator Chiltern Railways.

A newly launched petition is calling for the Government to ‘end the deadlock’.

A train at Oxford ParkwayChiltern Railways will operate the new line. Pictured: Oxford Parkway (Image: Oxford Mail)

It said: “The East West Rail Line was due to open last December for passenger services. It’s still not running.

“The Government needs to break the deadlock between Chiltern Railways and unions.

“There needs to be effective negotiation to resolve differences and find a solution. Services need to run urgently.

“People moved to the East West Rail Line corridor for work and to use the train for other reasons.

“Some have lost jobs because of the delay. Others, who expected to take the train, are struggling to battle rush hour traffic to places like Oxford.”

READ MORE: Oxford traffic planter slammed as ‘dangerous’ after incident

Railfuture, a campaign group promoting the expansion and efficacy of rail transport in the UK, said a dispute between the RMT Union and Chiltern Railways over Driver Only Operation is to blame for the delays.

The union said Chiltern Railways wants train drivers to open and close the doors at stations, with no train guards required – something which it has condemned as ‘unsafe’.

David Richardson, spokesperson for the Thames Valley branch of Railfuture, said: “We wholeheartedly support this petition and would urge anyone wanting to see better rail services in Oxford to support it.

East West Rail projectConstruction on the first section was completed in December 2024 (Image: EWR)

“We have suffered major disruption while the new bridge at Oxford station is put in to support an extra platform and new rail services, yet here we have a restored rail route that is open to freight trains but no passenger services are running.”

He said the petition would be discussed at the campaign groups AGM on May 12 in West Oxford Community Centre.

“Any further delay would be very, very frustrating,” Mr Richardson added.

READ MORE: Oxfordshire stars of Channel 4 show in water referendum call

The RMT Union disputes that the delay has been caused by its dispute with the train operator.

A union spokesperson said: “It is simply inaccurate to blame delays to East West Rail on our dispute when the project has been held back for years by indecision, rising costs and unresolved planning issues.

“The industrial dispute only affects one part of the route and the biggest delays sit squarely with those in charge of managing the project.”

They added delays to the reopening are due to the central section between Bedford and Cambridge still needing to be built, vacancies on the line, issues with the stations which have been built and new railways having to be designed, agreed and approved.

Oxford Station before upgrade worksThe new line will connect Oxford to Cambridge for the first time in nearly 70 years (Image: Greg Blatchford)

The spokesperson said: “We are opposed to Driver Only Operation because it is vital there is a second safety critical person on board.

“This can include being responsible for door operations but it is a highly varied role, dealing with passengers safety, particularly in emergencies. 

“The guaranteed presence of a second onboard safety critical staff member provides a safer environment and reassurance to passengers particularly women and girls travelling alone. 

“RMT members are committed to delivering a safe and reliable railway, but they will not accept being used as cover for failures in project management.”

A spokesperson for Chiltern Railways said: “Since being announced as operator of the first stage of East West Rail between Oxford and Milton Keynes in March 2025, we have been working at pace to get everything ready for services to begin on the new line.

READ MORE: Oxford police officers restrain machete-wielding drug dealer

“Significant progress has been made, including the hiring and training of 44 train drivers, the creation of a new colleague facility at Bletchley, and the fit out of a new modern station with step-free access at Winslow.

“However, there is work still to finish to prepare the trains, on Winslow station and on the operating arrangements for the new route.

“We are continuing our work on these areas in conjunction with industry colleagues and will provide updates as soon as we are able to.”





Source link

Continue Reading

Trending