Oxford News
Oxford specialist school celebrates strong GCSE results
LVS Oxford, a school for autistic young people, achieved a 100 per cent pass rate, with 80 per cent of grades at 9–4 – well above the national average of 67 per cent.
Executive principal Melanie Waller said: “We are incredibly proud of our students and everything they have achieved.
“GCSEs can be a significant challenge, and our young people have shown extraordinary resilience, determination and commitment.
“Seeing so many students achieve or exceed their predicted grades is a fantastic reflection of their hard work and the dedication of our staff.”
More than 40 per cent of students exceeded their predicted grades, with some achieving results two, three, or even four grades higher.
The school reported standout results in core subjects, with 87.5 per cent of students achieving grades 9–4 in English language (compared to the national average of 59.5 per cent) and 66.7 per cent achieving the same in maths (national average: 57.2 per cent).
Ms Waller said it was especially rewarding to see students succeed across a wide range of subjects beyond the traditional core curriculum.
She said: “It is particularly rewarding to see our students succeeding across such a diverse range of subjects.
“Whether through academic study, creative subjects, practical learning or their wider experiences, our young people continue to show us what they can achieve when their individual strengths are recognised and nurtured.”
The school’s curriculum goes beyond academics to include practical, vocational, employability, and life skills, preparing students for life after school.
This year, all students secured places in further education, college, or apprenticeships.
Ms Waller said: “Our 100 per cent transition success is something we are incredibly proud of.
“For our autistic students, these achievements are particularly significant.
“Our role is not simply to prepare students for examinations; it is to prepare them for life beyond LVS Oxford.
“Whether a young person progresses to college, secures an apprenticeship or takes another pathway into their future, we are incredibly proud of what they have achieved.
“Every student has their own individual strengths, challenges and aspirations, and it is our job to help them recognise their potential and give them the confidence and skills to take their next steps.”
The executive principal described the results as a testament to the resilience of students, the dedication of staff, and the support of families.
She said: “It is a testament to the resilience and determination of our students, the commitment of our staff and the support of our families and a powerful reflection of what autistic young people can achieve when they are given the right environment, opportunities and support to thrive.”
Oxford News
Molly relaxing on the grass is a camera club winner
OXFORD Mail Camera Club members have been taking photos of their dogs
Source link
Oxford News
M40 traffic caused by car crash near Bucks Oxon border
The collision happened on the southbound carriageway between Junction 6 for Lewknor and Junction 5 for Watlington in the late morning on Saturday, August 29.
The emergency services attended the scene and closed the road,
National Highways said lanes two and three of the three-lane motorway were shut as a result while crews dealt with the incident, leading to delays of around 40 minutes.
Congestion was worsened by separate lane closures between Junctions 4 and 5 in both directions following damage to the central reservation from an earlier incident.
Traffic built up on approaches to the crash, with nearby areas including Stokenchurch and Lewknor also affected.
Images from traffic cameras showed long queues of vehicles and emergency workers at the scene throughout the afternoon.
AA Travel also reported that one lane was closed on the northbound carriageway between Handy Cross and Stokenchurch due to emergency repairs.
National Highways later confirmed that all southbound lanes between Junctions 6 and 5 had reopened and that the lane closures linked to the earlier incident were also being removed.
Despite the reopening, delays of around 40 minutes remained on the approach as traffic slowly returned to normal.
Oxford News
Oxfordshire road between the A420 and Coxwell Road to close
The closure affects the route between the A420 and Coxwell Road near Great Coxwell to allow for carriageway widening and the construction of a new signal-controlled junction.
The closure, in effect 24 hours a day, will begin on September 7, 2026, and is expected to remain in place until April 16, 2027.
An alternative route will be signposted via the A420, London Street, Coxwell Street, and Coxwell Road.
The order, issued by Oxfordshire County Council under the Road Traffic Regulation Act 1984, will remain in force for up to 18 months if necessary.
Exemptions are included for emergency vehicles, and signage will be in place to advise drivers of the closure.
-
Oxford News3 weeks agoTrain cancellation alert amid ‘fault’ near London Paddington
-
Oxford News2 weeks agoMuseum evacuated and Oxford University closed amid incident
-
Business & Technology4 weeks agoBritish Business Bank backs PhysicsX with USD $25 million
-
Business & Technology4 weeks agoNuggit launches GBP £5 million fund for UK YouTubers
-
Business & Technology4 weeks agoMuscle Food at risk of closing after entering administration
-
Business & Technology4 weeks agoHistoric town faces series of high street shop closures
-
Student Life4 weeks agoMy year of rest and rustication
-
Student Life4 weeks agoAcademic tourism: Oxford University and its summer schools
